It is designed and manufactured especially for flat roofing installations. Allow adhesive to dry for 2 – 5 minutes before bonding Once the EPDM is laid, consolidate the bond with a weighted roller or soft broom Excess adhesive can be removed with a solvent cleaner such as Acetone.